Matakitaki River, Murchison

Project Info

Client: TDC and NZTA

Project Description

The Matakitaki river works was a joint TDC and NZTA job to protect the SH6 bridge over the Matakitaki river and decrease the impact on surrounding areas during flood events in Murchison. Along with an estimated 78,000m3 volume of gravel removed from the river more than 5000 ton of rock was placed in the channel for bank protection. Rock rip rap protection walls were constructed under both ends of the bridge to protect the bridge abutments. Spur groynes were also placed on both banks upstream to help direct the river under the centre of the SH6 bridge.

Related Projects

August 2022 Flood Recovery

August 2022 Flood Recovery

August 2022 Flood Recovery Project Info Clients: Fulton Hogan/Waka Kotahi (NZTA)/Nelson City Council Project Description   In response to the extraordinary weather in August 2022 which saw extensive rainfall, flooding and slips across the region, Taylors deployed...

Seafield Terrace Rock Revetment

Seafield Terrace Rock Revetment

Seafield Terrace Rock Revetment WorksProject InfoClient: Nelson City CouncilProject DescriptionWINNER: CCNZ Nelson Marlborough 2021 Awards, $750,001 – $1.5 million Category This project entailed coastal erosion remedial work at Seafield Terrace, Glenduan. After a...

Pigeon Valley Fire

Pigeon Valley Fire

Pigeon Valley FireProject InfoClient: FENZ National Incident TeamProject Description2019 CCNZ Nelson Marlborough Award Winner. $700,001 – $1.5 million category, sponsored by Land Dimensions Ltd We were very honored to win the above award for our work assisting on the...