The Gollans Bay Quarry Road project has now been completed, April 2018.

This project has been a great challenging job with 240,000 cubic metres being excavated and carted down the hill to the ports reclaim area. The 670 excavator was the main machine excavating and loading out and the 330-5 has had a rock breaker on most of the time with four A30 dump trucks carting.

The drilling and blasting was managed exceptionally well, with no fly rock falling onto the coal below.

This video includes shots of us finishing the haul road.

Related Projects

Kate Valley Landfill and Energy Park (Phase 2)

Kate Valley Landfill and Energy Park (Phase 2)

Kate Valley Landfill and Energy Park (Phase 2)Project InfoClient: Waste Management NZ (WM)Collaborators: Canterbury Waste Services (CWS), Geotechnics, Eliot SinclairProject DescriptionKey Project ChallengesWorking adjacent to an operational landfill Tight...

Branch River Infiltration Gallery

Branch River Infiltration Gallery

Branch River Infiltration GalleryProject InfoClient: Manawa Energy Collaborators: Fulton Hogan Civil (Taylors partnered with Fulton Hogan Civil as the Concrete construction subcontractor) Project DescriptionTaylors were contracted to construct the Branch River Intake...

Waimea Community Dam

Waimea Community Dam

Waimea Community DamProject InfoClient: Waimea Water Ltd Designer: DamwatchProject DescriptionThe Waimea Community Dam is a concrete-faced, rock-filled dam being constructed in the Lee Valley, near Nelson. It is one of the region’s most important infrastructure...